SAP C_TSCM42_66 Dumps | Download Latest Microsoft Exam Questions

Vendor: SAP
Exam Code: C_TSCM42_66
Exam Name: SAP Certified Application Associate – Production – Planning & Manufacturing with SAP ERP 6.0 EHP6

QUESTION 1
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

A.    Total planning online
B.    Multi-level single-item planning with the "display material list" option
C.    Interactive single-item planning for the delayed assembly
D.    Multi-level single-item planning with the "simulation mode" option

Answer: D

QUESTION 2
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?

A.    Set "Container in process"
B.    Set "Container empty"
C.    Set "Container in transport"
D.    Set "Container full"

Answer: D

QUESTION 3
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following properties for the resulting dependent requirements applies?

A.    In multi-level backward scheduling, dependent requirements are calculated to the exact second.
B.    If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.
C.    When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
D.    In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.

Answer: D

QUESTION 4
Which of the following properties applies to multi-site planning in SAP ECC?

A.    When using one-step stock transfer posting, transfer stock is created in the receiving plant.
B.    Multi-site planning can be activated using the corresponding planning strategy.
C.    Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.
D.    The use of "scope of planning" is always mandatory for multi-site planning.

Answer: C

QUESTION 5
During a project phase, your customer raises some questions concerning parameters of the
procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)

A.    If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in-house production.
B.    Procurement types E (in-house production) and F (external procurement) always have to be further refined with special procurement types.
C.    Procurement types E (in-house production), F (external procurement), or X (both procurement types) can be selected for a material independent of the material type.
D.    If procurement type E (in-house production) is set, external procurement may still be possible, depending on the material type.

Answer: AD

QUESTION 6
Which of the following statements best defines SAP ERP?

A.    SAP ERP is an application that supports all processes involving direct customer contact throughout the entire customer relationship life cycle.
B.    SAP ERP is an application that a company can use to manage its business processes efficiently.
C.    SAP ERP is a system in which advanced planning and optimization processes can be mapped.
D.    SAP ERP is a system hardware that includes components such as Purchasing, Sales and Distribution, Materials Management, and Production.

Answer: B

QUESTION 7
Which option for selecting a routing exists when you create a production order?

A.    Automatic selection of a reference operation set
B.    Manual selection based on settings in the order type-dependent parameters
C.    Automatic selection based on the selection ID in the material master
D.    Manual selection based on the list of routings maintained in the material master

Answer: B

QUESTION 8
Which of the following items of master data are needed for repetitive manufacturing? (Choose three)

A.    Production supply area
B.    Repetitive manufacturing profile
C.    Production version
D.    Master record for serial numbers
E.    Product cost collector

Answer: BCE

If you want to pass SAP C_TSCM42_66 successfully, donot missing to read latest lead2pass SAP C_TSCM42_66 practice exams.
If you can master all lead2pass questions you will able to pass 100% guaranteed.

http://www.lead2pass.com/C-TSCM42-66.html